California-certified DVBE

Verify on Cal eProcure ↗
TD
05-1K4514DVBE 5%SBE 5%

Landscape Planting.

SANTA BARBARA COUNTY NEAR BUELLTON AT VARIOUS LOCATIONS FROM 3.6 MILES NORTH OF ROUTE 1/101 SEPARATION TO 1.3 MILES SOUTH OF ROUTE 101/246 SEPARATION

District
05
County-Route-PM
SB-101-R52.3/55.8
Advertised
2026-10-19
Bids open
2026-11-18
Engineer’s estimate
$480,000
Working days
790
Goal
DVBE

Bids opened 2026-11-18 · Status: Scheduled. Awarded primes still have to document DVBE participation — and replace commitments that fall through. Tower can supply the materials on this contract.

Bid item list is from Caltrans Contractor's Corner. Per-item engineer's estimates are withheld by Caltrans until bids open — quantities and units below are the official advertised values.

Bid item list (21 items)
ItemCodeDescriptionUnitEst. Qty
1070031LEAD COMPLIANCE PLAN (INFORMATIONAL)LS1
2090100TIME-RELATED OVERHEAD (WDAY)WDAY40
3120090CONSTRUCTION AREA SIGNSLS1
4120100TRAFFIC CONTROL SYSTEMLS1
5120103STATIONARY IMPACT ATTENUATOR VEHICLEDAY30
6120207PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMDAY30
7128652PORTABLE CHANGEABLE MESSAGE SIGN (LS)LS1
8130100JOB SITE MANAGEMENTLS1
9130201WATER POLLUTION CONTROL PROGRAMLS1
10200002ROADSIDE CLEARINGLS1
11202006SOIL AMENDMENTCY45
12202038PACKET FERTILIZEREA2,000
13204008PLANT (GROUP H)EA60
14204009PLANT (GROUP I)EA220
15204035PLANT (GROUP A)EA790
16204096MAINTAIN EXISTING PLANTED AREASLS1
17204097PLANT ESTABLISHMENT WORK (MINIMUM BID)LS1
18205035WOOD MULCHCY260
19205051FOLIAGE PROTECTOREA170
20206300TEMPORARY IRRIGATION SYSTEMLS1
21210212DRY SEED (SQFT)SQFT67,700