10-1H5604DVBESBE 5%Postponed
Construct maintenance facilities.
ALPINE COUNTY NEAR KIRKWOOD AT CAPLES LAKE MAINTENANCE STATION
- District
- 10
- County-Route-PM
- Alp-88-1.9
- Advertised
- 2026-07-20
- Bids open
- 2026-09-03
- Engineer’s estimate
- $32,000,000
- Working days
- 685
- Goal
- DVBE Participation Incentive up to $250,000.
Bid item list is from Caltrans Contractor's Corner. Per-item engineer's estimates are withheld by Caltrans until bids open — quantities and units below are the official advertised values.
Bid item list (51 items)
| Item | Code | Description | Unit | Est. Qty |
|---|---|---|---|---|
| 1 | 015603 | POTHOLE UNDERGROUND UTILITIES | EA | 15 |
| 2 | 070030 | LEAD COMPLIANCE PLAN | LS | 1 |
| 3 | 080060 | LEVEL 2 CRITICAL PATH METHOD SCHEDULE | LS | 1 |
| 4 | 090100 | TIME-RELATED OVERHEAD (WDAY) | WDAY | 685 |
| 5 | 090205 | DISPUTE RESOLUTION BOARD ON-SITE MEETING | EA | 20 |
| 6 | 090210 | HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS | HR | 20 |
| 7 | 120090 | CONSTRUCTION AREA SIGNS | LS | 1 |
| 8 | 120320 | TEMPORARY BARRIER SYSTEM | LF | 320 |
| 9 | 130100 | JOB SITE MANAGEMENT | LS | 1 |
| 10 | 130201 | WATER POLLUTION CONTROL PROGRAM | LS | 1 |
| 11 | 130530 | TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) | SQYD | 1,510 |
| 12 | 130640 | TEMPORARY FIBER ROLL | LF | 1,600 |
| 13 | 130680 | TEMPORARY SILT FENCE | LF | 730 |
| 14 | 130710 | TEMPORARY CONSTRUCTION ENTRANCE | EA | 1 |
| 15 | 130730 | STREET SWEEPING | LS | 1 |
| 16 | 130900 | TEMPORARY CONCRETE WASHOUT | LS | 1 |
| 17 | 140003 | ASBESTOS COMPLIANCE PLAN | LS | 1 |
| 18 | 014001 | ASBESTOS REMOVAL WORK PLAN | LS | 1 |
| 19 | 160110 | TEMPORARY HIGH-VISIBILITY FENCE | LF | 1,450 |
| 20 | 170103 | CLEARING AND GRUBBING (LS) | LS | 1 |
| 21 | 190101 | ROADWAY EXCAVATION | CY | 50 |
| 22 | 190185 | SHOULDER BACKING | TON | 27 |
| 23 | 192037 | STRUCTURE EXCAVATION (RETAINING WALL) | CY | 896 |
| 24 | 193013 | STRUCTURE BACKFILL (RETAINING WALL) | CY | 1,322 |
| 25 | 193031 | PERVIOUS BACKFILL MATERIAL (RETAINING WALL) | CY | 175 |
| 26 | 198010 | IMPORTED BORROW (CY) | CY | 5,180 |
| 27 | 210252 | BONDED FIBER MATRIX (SQFT) | SQFT | 32,600 |
| 28 | 210350 | FIBER ROLLS | LF | 1,930 |
| 29 | 210610 | COMPOST (CY) | CY | 120 |
| 30 | 210630 | INCORPORATE MATERIALS | SQFT | 32,600 |
| 31 | 260203 | CLASS 2 AGGREGATE BASE (CY) | CY | 560 |
| 32 | 390132 | HOT MIX ASPHALT (TYPE A) | TON | 780 |
| 33 | 397005 | TACK COAT | TON | 1.5 |
| 34 | 398200 | COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 550 |
| 35 | 510060 | STRUCTURAL CONCRETE, RETAINING WALL | CY | 566 |
| 36 | 510502 | MINOR CONCRETE (MINOR STRUCTURE) | CY | 8 |
| 37 | 520103 | BAR REINFORCING STEEL (RETAINING WALL) | LB | 61,665 |
| 38 | 652316 | 24" REINFORCED CONCRETE PIPE (CLASS III, RUBBER GASKET JOINT) | LF | 180 |
| 39 | 691902 | 10" FLUME DOWNDRAIN | LF | 61 |
| 40 | 692104 | 10" TAPERED INLET | EA | 1 |
| 41 | 692364 | 10" FLUME ANCHOR ASSEMBLY | EA | 6 |
| 42 | 705206 | 24" CONCRETE FLARED END SECTION | EA | 2 |
| 43 | 723080 | ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) | CY | 18 |
| 44 | 729011 | ROCK SLOPE PROTECTION FABRIC (CLASS 8) | SQYD | 80 |
| 45 | 810190 | GUARD RAILING DELINEATOR | EA | 12 |
| 46 | 820132 | OBJECT MARKER (TYPE L) | EA | 2 |
| 47 | 832006 | MIDWEST GUARDRAIL SYSTEM (STEEL POST) | LF | 280 |
| 48 | 832070 | VEGETATION CONTROL (MINOR CONCRETE) | SQYD | 130 |
| 49 | 839521 | CABLE RAILING | LF | 250 |
| 50 | 839580 | END ANCHOR ASSEMBLY (TYPE SFT-M) | EA | 2 |
| 51 | 994650 | BUILDING WORK | LS | 1 |