07-379604
Construct and install stormwater treatment BMPs and MVPs.
VENTURA COUNTY ON ROUTE 1 FROM 0.2 MILE NORTH OF POINT MUGU TO 0.1 MILE SOUTH OF CALLEGUAS CREEK ROAD AND ON ROUTE 34 FROM 0.1 MILE EAST OF EAST PLEASANT VALLEY ROAD TO 0.8 MILE EAST OF UPLAND ROAD
- District
- 07
- County-Route-PM
- Ven-1, 34-7.6/9.7, 8.6/16.7
- Advertised
- 2026-11-09
- Bids open
- 2026-12-10
- Engineer’s estimate
- $4,590,000
- Working days
- 550
- Goal
- NO GOAL %
Bids opened 2026-12-10 · Status: Scheduled.
Bid item list is from Caltrans Contractor's Corner. Per-item engineer's estimates are withheld by Caltrans until bids open — quantities and units below are the official advertised values.
Bid item list (34 items)
| Item | Code | Description | Unit | Est. Qty |
|---|---|---|---|---|
| 1 | 070030 | LEAD COMPLIANCE PLAN | LS | 1 |
| 2 | 013844 | PROGRESS SCHEDULE (CRITICAL PATH METHOD) | LS | 1 |
| 3 | 090100 | TIME-RELATED OVERHEAD (WDAY) | WDAY | 300 |
| 4 | 090200 | DISPUTE RESOLUTION ADVISOR ON-SITE MEETING | EA | 7 |
| 5 | 090207 | HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS | HR | 10 |
| 6 | 120090 | CONSTRUCTION AREA SIGNS | LS | 1 |
| 7 | 120100 | TRAFFIC CONTROL SYSTEM | LS | 1 |
| 8 | 120165 | CHANNELIZER (SURFACE MOUNTED) | EA | 150 |
| 9 | 120207 | PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM | DAY | 300 |
| 10 | 120320 | TEMPORARY BARRIER SYSTEM | LF | 25,600 |
| 11 | 129100 | TEMPORARY CRASH CUSHION MODULE | EA | 170 |
| 12 | 129152 | TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM | EA | 1 |
| 13 | 130100 | JOB SITE MANAGEMENT | LS | 1 |
| 14 | 130201 | WATER POLLUTION CONTROL PROGRAM | LS | 1 |
| 15 | 130640 | TEMPORARY FIBER ROLL | LF | 23,000 |
| 16 | 130680 | TEMPORARY SILT FENCE | LF | 23,000 |
| 17 | 130710 | TEMPORARY CONSTRUCTION ENTRANCE | EA | 11 |
| 18 | 170103 | CLEARING AND GRUBBING (LS) | LS | 1 |
| 19 | 190101 | ROADWAY EXCAVATION | CY | 120 |
| 20 | 190105 | ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) | CY | 1,250 |
| 21 | 198050 | EMBANKMENT | CY | 1,000 |
| 22 | 198232 | GEOSYNTHETIC REINFORCEMENT, PR2000 | SQYD | 380 |
| 23 | 200114 | ROCK BLANKET | SQFT | 1,460 |
| 24 | 200123 | CULTIVATION | SQYD | 3,830 |
| 25 | 206300 | TEMPORARY IRRIGATION SYSTEM | LS | 1 |
| 26 | 210010 | MOVE-IN/MOVE-OUT (EROSION CONTROL) | EA | 2 |
| 27 | 210430 | HYDROSEED | SQFT | 34,500 |
| 28 | 210610 | COMPOST (CY) | CY | 55 |
| 29 | 260303 | CLASS 3 AGGREGATE BASE (CY) | CY | 45 |
| 30 | 390132 | HOT MIX ASPHALT (TYPE A) | TON | 150 |
| 31 | 038422 | DPP INFILTRATION AREA (ROCK)(CY) | CY | 1,690 |
| 32 | 810170 | DELINEATOR (CLASS 1) | EA | 14 |
| 33 | 820113 | TREATMENT BEST MANAGEMENT PRACTICE MARKER | EA | 26 |
| 34 | 999990 | MOBILIZATION | LS | 1 |