07-1Q9604DVBE 5%SBE 5%
Slope erosion repair.
LOS ANGELES COUNTY IN LOS ANGELES AT LANKERSHIM BOULEVARD OVERCROSSING
- District
- 07
- County-Route-PM
- LA-5-35.0
- Advertised
- 2026-05-11
- Bids open
- 2026-06-03
- Engineer’s estimate
- $630,000
- Working days
- 150
- Goal
- DVBE
Bids opened 2026-06-03 · Status: Bid Opened. Awarded primes still have to document DVBE participation — and replace commitments that fall through. Tower can supply the materials on this contract.
Bid item list is from Caltrans Contractor's Corner. Per-item engineer's estimates are withheld by Caltrans until bids open — quantities and units below are the official advertised values.
Bid item list (37 items)
| Item | Code | Description | Unit | Est. Qty |
|---|---|---|---|---|
| 1 | 070030 | LEAD COMPLIANCE PLAN | LS | 1 |
| 2 | 090100 | TIME-RELATED OVERHEAD (WDAY) | WDAY | 60 |
| 3 | 120090 | CONSTRUCTION AREA SIGNS | LS | 1 |
| 4 | 120100 | TRAFFIC CONTROL SYSTEM | LS | 1 |
| 5 | 120165 | CHANNELIZER (SURFACE MOUNTED) | EA | 15 |
| 6 | 120205 | PORTABLE FLASHING BEACONS (EA) | EA | 1 |
| 7 | 120207 | PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM | DAY | 37 |
| 8 | 120320 | TEMPORARY BARRIER SYSTEM | LF | 940 |
| 9 | 129108 | TEMPORARY CRASH CUSHION TL-3 | EA | 1 |
| 10 | 129152 | TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM | EA | 1 |
| 11 | 130100 | JOB SITE MANAGEMENT | LS | 1 |
| 12 | 130201 | WATER POLLUTION CONTROL PROGRAM | LS | 1 |
| 13 | 130520 | TEMPORARY HYDRAULIC MULCH | SQYD | 3,320 |
| 14 | 130620 | TEMPORARY DRAINAGE INLET PROTECTION | EA | 6 |
| 15 | 153248 | REMOVE CONCRETE (MISCELLANEOUS) (SQFT) | SQFT | 820 |
| 16 | 190105 | ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) | CY | 87 |
| 17 | 202028 | RELOCATE IRRIGATION CONTROLLER | EA | 1 |
| 18 | 202039 | SLOW-RELEASE FERTILIZER | LB | 37 |
| 19 | 204036 | PLANT (GROUP B) | EA | 67 |
| 20 | 204038 | PLANT (GROUP U) | EA | 4 |
| 21 | 204096 | MAINTAIN EXISTING PLANTED AREAS | LS | 1 |
| 22 | 204099 | PLANT ESTABLISHMENT WORK | LS | 1 |
| 23 | 205035 | WOOD MULCH | CY | 6 |
| 24 | 206400 | CHECK AND TEST EXISTING IRRIGATION FACILITIES | LS | 1 |
| 25 | 206402 | OPERATE EXISTING IRRIGATION FACILITIES | LS | 1 |
| 26 | 206560 | CONTROL AND NEUTRAL CONDUCTORS | LS | 1 |
| 27 | 208445 | TREE WELL SPRINKLER ASSEMBLY | EA | 7 |
| 28 | 208448 | RISER SPRINKLER ASSEMBLY | EA | 67 |
| 29 | 208595 | 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 811 |
| 30 | 208596 | 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 320 |
| 31 | 208597 | 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 24 |
| 32 | 018476 | SLOPE PAVING WITH COBBLESTONE | SQFT | 5,010 |
| 33 | 820134 | OBJECT MARKER (TYPE P) | EA | 1 |
| 34 | 870009 | MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION | LS | 1 |
| 35 | 870136 | ELECTRIC SERVICE FOR IRRIGATION | LS | 1 |
| 36 | 039162 | MODIFYING FIBER OPTIC CABLE SYSTEMS | LS | 1 |
| 37 | 999990 | MOBILIZATION | LS | 1 |