04-1Q76U4
Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.
SONOMA COUNTY AT SEARS POINT ON ROUTE 37 FROM 0.2 MILE WEST OF ROUTE 121 TO 0.9 MILE EAST OF TOLAY CREEK BRIDGE AND ON ROUTE 121 FROM ROUTE 37 TO 0.2 MILE NORTH OF ROUTE 37
- District
- 04
- County-Route-PM
- Son-37, 121-3.7/4.9, 0.0/0.2
- Advertised
- 2026-10-05
- Bids open
- 2026-11-18
- Engineer’s estimate
- $120,000,000
- Working days
- 1,350
- Goal
- NO GOAL %
Bids opened 2026-11-18 · Status: Scheduled.
Bid item list is from Caltrans Contractor's Corner. Per-item engineer's estimates are withheld by Caltrans until bids open — quantities and units below are the official advertised values.
Bid item list (210 items)
| Item | Code | Description | Unit | Est. Qty |
|---|---|---|---|---|
| 1 | 070030 | LEAD COMPLIANCE PLAN | LS | 1 |
| 2 | 080060 | LEVEL 2 CRITICAL PATH METHOD SCHEDULE | LS | 1 |
| 3 | 090100 | TIME-RELATED OVERHEAD (WDAY) | WDAY | 1,100 |
| 4 | 090205 | DISPUTE RESOLUTION BOARD ON-SITE MEETING | EA | 24 |
| 5 | 090210 | HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS | HR | 80 |
| 6 | 090214 | SAFETY QUALITY CONTROL MANAGER | LS | 1 |
| 7 | 120090 | CONSTRUCTION AREA SIGNS | LS | 1 |
| 8 | 120100 | TRAFFIC CONTROL SYSTEM | LS | 1 |
| 9 | 120103 | STATIONARY IMPACT ATTENUATOR VEHICLE | DAY | 126 |
| 10 | 120149 | TEMPORARY PAVEMENT MARKING (PAINT) | SQFT | 2,260 |
| 11 | 120159 | TEMPORARY TRAFFIC STRIPE (PAINT) | LF | 60,700 |
| 12 | 120165 | CHANNELIZER (SURFACE MOUNTED) | EA | 220 |
| 13 | 120207 | PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM | DAY | 180 |
| 14 | 120300 | TEMPORARY PAVEMENT MARKER | EA | 740 |
| 15 | 120320 | TEMPORARY BARRIER SYSTEM | LF | 13,300 |
| 16 | 128651 | PORTABLE CHANGEABLE MESSAGE SIGN (EA) | EA | 11 |
| 17 | 017996 | MOTORIST INFORMATION PCMS (LS) | LS | 1 |
| 18 | 129108 | TEMPORARY CRASH CUSHION TL-3 | EA | 15 |
| 19 | 129150 | TEMPORARY TRAFFIC SCREEN | LF | 13,300 |
| 20 | 130100 | JOB SITE MANAGEMENT | LS | 1 |
| 21 | 130301 | STORMWATER POLLUTION PREVENTION PLAN | LS | 1 |
| 22 | 130312 | PRE-STORM EVENT INSPECTION REPORT | EA | 190 |
| 23 | 130323 | DURING-AND POST-STORM EVENT INSPECTION REPORT | DAY | 116 |
| 24 | 130331 | STORMWATER ANNUAL REPORT | EA | 6 |
| 25 | 130500 | TEMPORARY EROSION CONTROL BLANKET | SQYD | 8,000 |
| 26 | 130530 | TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) | SQYD | 2,730 |
| 27 | 130610 | TEMPORARY CHECK DAM | LF | 740 |
| 28 | 130620 | TEMPORARY DRAINAGE INLET PROTECTION | EA | 14 |
| 29 | 130640 | TEMPORARY FIBER ROLL | LF | 6,120 |
| 30 | 130670 | TEMPORARY REINFORCED SILT FENCE | LF | 2,570 |
| 31 | 130710 | TEMPORARY CONSTRUCTION ENTRANCE | EA | 3 |
| 32 | 130730 | STREET SWEEPING | LS | 1 |
| 33 | 130900 | TEMPORARY CONCRETE WASHOUT | LS | 1 |
| 34 | 131103 | WATER QUALITY SAMPLING AND ANALYSIS DAY | EA | 420 |
| 35 | 131201 | TEMPORARY CREEK DIVERSION SYSTEMS | LS | 1 |
| 36 | 140003 | ASBESTOS COMPLIANCE PLAN | LS | 1 |
| 37 | 141103 | REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) | LF | 9,510 |
| 38 | 141104 | REMOVE YELLOW THERMOPLASTIC PAVEMENT MARKING (HAZARDOUS WASTE) | SQFT | 1,240 |
| 39 | 141120 | TREATED WOOD WASTE | LB | 41,900 |
| 40 | 014614 | BIOMONITORING AND BIRD PROTECTION | LS | 1 |
| 41 | 146007 | INVASIVE SPECIES CONTROL | LS | 1 |
| 42 | 148005 | NOISE MONITORING | LS | 1 |
| 43 | 018842 | TEMPORARY DEWATERING AND NON-STORM WATER DISCHARGE CONTROL SYSTEM (LS) | LS | 1 |
| 44 | 160110 | TEMPORARY HIGH-VISIBILITY FENCE | LF | 7,770 |
| 45 | 160220 | TEMPORARY CONSTRUCTION MAT (LS) | LS | 1 |
| 46 | 170103 | CLEARING AND GRUBBING (LS) | LS | 1 |
| 47 | 190101 | ROADWAY EXCAVATION | CY | 30,400 |
| 48 | 190105 | ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) | CY | 1,610 |
| 49 | 190185 | SHOULDER BACKING | TON | 53 |
| 50 | 192020 | STRUCTURE EXCAVATION (TYPE D) | CY | 591 |
| 51 | 048428 | STRUCTURE EXCAVATION (RETAINING WALL, TYPE D) | CY | 13,356 |
| 52 | 048984 | STRUCTURE EXCAVATION (SECANT PILE WALL, TYPE D) | CY | 155 |
| 53 | 193013 | STRUCTURE BACKFILL (RETAINING WALL) | CY | 2,372 |
| 54 | 048343 | CONCRETE BACKFILL (SECANT PILE WALL) | CY | 1,643 |
| 55 | 194001 | DITCH EXCAVATION | CY | 1,710 |
| 56 | 037579 | IMPORTED BORROW(LIGHTWEIGHT AGGREGATE) | CY | 5,660 |
| 57 | 198105 | LIGHTWEIGHT CELLULAR CONCRETE FILL | CY | 26,800 |
| 58 | 198208 | SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B1 | SQYD | 21,400 |
| 59 | 010347 | BIAXIAL GEOGRID | SQYD | 29,500 |
| 60 | 200113 | ROCK MULCH | SQFT | 130 |
| 61 | 200122 | WEED GERMINATION | SQYD | 25,000 |
| 62 | 202004 | IRON SULFATE (LB) | LB | 6 |
| 63 | 202006 | SOIL AMENDMENT | CY | 0.2 |
| 64 | 202037 | ORGANIC FERTILIZER | LB | 17,800 |
| 65 | 202039 | SLOW-RELEASE FERTILIZER | LB | 0.5 |
| 66 | 202040 | MYCORRHIZAE INOCULANT | LB | 360 |
| 67 | 203100 | SOIL TESTING | EA | 6 |
| 68 | 204008 | PLANT (GROUP H) | EA | 39 |
| 69 | 204009 | PLANT (GROUP I) | EA | 3 |
| 70 | 204099 | PLANT ESTABLISHMENT WORK | LS | 1 |
| 71 | 205035 | WOOD MULCH | CY | 0.7 |
| 72 | 205051 | FOLIAGE PROTECTOR | EA | 3 |
| 73 | 206633 | 1 1/2" WYE STRAINER ASSEMBLY | EA | 1 |
| 74 | 015542 | FLOW METER | EA | 6 |
| 75 | 018873 | TREE BUBBLER ASSEMBLY | EA | 48 |
| 76 | 208562 | CAM COUPLER ASSEMBLY | EA | 1 |
| 77 | 208594 | 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 210 |
| 78 | 208595 | 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 930 |
| 79 | 208596 | 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 280 |
| 80 | 208597 | 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 41 |
| 81 | 208649 | QUICK COUPLING VALVE | EA | 4 |
| 82 | 208684 | 1" BALL VALVE | EA | 1 |
| 83 | 208685 | 1 1/2" BALL VALVE | EA | 1 |
| 84 | 210010 | MOVE-IN/MOVE-OUT (EROSION CONTROL) | EA | 12 |
| 85 | 210270 | ROLLED EROSION CONTROL PRODUCT (NETTING) | SQFT | 157,000 |
| 86 | 210280 | ROLLED EROSION CONTROL PRODUCT (BLANKET) | SQFT | 200 |
| 87 | 210300 | HYDROMULCH | SQFT | 106,000 |
| 88 | 210350 | FIBER ROLLS | LF | 7,300 |
| 89 | 210420 | STRAW | SQFT | 105,000 |
| 90 | 210430 | HYDROSEED | SQFT | 259,000 |
| 91 | 210610 | COMPOST (CY) | CY | 740 |
| 92 | 210630 | INCORPORATE MATERIALS | SQFT | 105,000 |
| 93 | 260203 | CLASS 2 AGGREGATE BASE (CY) | CY | 7,860 |
| 94 | 390132 | HOT MIX ASPHALT (TYPE A) | TON | 12,700 |
| 95 | 390135 | HOT MIX ASPHALT (LEVELING) | TON | 2,570 |
| 96 | 013430 | RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP | TON | 4,560 |
| 97 | 393006 | GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING GRID) | SQYD | 48,900 |
| 98 | 394074 | PLACE HOT MIX ASPHALT DIKE (TYPE C) | LF | 140 |
| 99 | 394076 | PLACE HOT MIX ASPHALT DIKE (TYPE E) | LF | 760 |
| 100 | 394077 | PLACE HOT MIX ASPHALT DIKE (TYPE F) | LF | 1,170 |
| 101 | 394090 | PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) | SQYD | 31 |
| 102 | 397005 | TACK COAT | TON | 44 |
| 103 | 398100 | REMOVE ASPHALT CONCRETE DIKE | LF | 1,040 |
| 104 | 398200 | COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 19,900 |
| 105 | 048571 | TEMPORARY BRIDGE (MODULAR) | LS | 1 |
| 106 | 048986 | 48\" DRILLED HOLE | LF | 3,238 |
| 107 | 048988 | 54\" PERMANENT STEEL CASING | LF | 2,395 |
| 108 | 490607 | 48" CAST-IN-DRILLED-HOLE CONCRETE PILING | LF | 3,553 |
| 109 | 490608 | 54" CAST-IN-DRILLED-HOLE CONCRETE PILING | LF | 2,409 |
| 110 | 048987 | 48\" CAST-IN-DRILLED-HOLE CONCRETE PILING (SECANT PILE WALL) | LF | 4,229 |
| 111 | 048546 | FURNISH PILING (CLASS 200, ALTERNATIVE W) | LF | 77,760 |
| 112 | 048547 | DRIVE PILE (CLASS 200, ALTERNATIVE W) | EA | 744 |
| 113 | 510053 | STRUCTURAL CONCRETE, BRIDGE | CY | 635 |
| 114 | 510054 | STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) | CY | 783 |
| 115 | 510060 | STRUCTURAL CONCRETE, RETAINING WALL | CY | 4,232 |
| 116 | 510088 | STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) | CY | 353 |
| 117 | 510094 | STRUCTURAL CONCRETE, DRAINAGE INLET | CY | 29 |
| 118 | 510502 | MINOR CONCRETE (MINOR STRUCTURE) | CY | 80 |
| 119 | 511015 | CONCRETE SURFACE TEXTURE (FRACTURED RIB) | SQFT | 30,288 |
| 120 | 512352 | FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SII) | SQFT | 3,848 |
| 121 | 512353 | FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIII) | SQFT | 8,991 |
| 122 | 512354 | FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIV) | SQFT | 16,322 |
| 123 | 048985 | ERECT PRECAST PRESTRESSED CONCRETE SLAB | EA | 162 |
| 124 | 518005 | PIPE PIN | LB | 10,500 |
| 125 | 519100 | JOINT SEAL (MR 2") | LF | 183 |
| 126 | 048167 | BAR REINFORCING STEEL (RETAINING WALL, EPOXY COATED) | LB | 777,270 |
| 127 | 048204 | BAR REINFORCING STEEL (BRIDGE, EPOXY COATED) | LB | 1,494,000 |
| 128 | 048350 | BAR REINFORCING STEEL (SECANT PILE WALL, EPOXY COATED) | LB | 759,500 |
| 129 | 048315 | HEADED BAR REINFORCEMENT (EPOXY COATED) | EA | 32 |
| 130 | 600097 | BRIDGE REMOVAL | LS | 1 |
| 131 | 018878 | BIORETENTION SOIL MEDIA (BSM) | CY | 340 |
| 132 | 650014 | 18" REINFORCED CONCRETE PIPE | LF | 880 |
| 133 | 650018 | 24" REINFORCED CONCRETE PIPE | LF | 110 |
| 134 | 018874 | MODIFIED 18\" SLOTTED CORRUGATED STEEL PIPE (.064\" THICK) | LF | 80 |
| 135 | 681132 | GEOCOMPOSITE DRAIN | SQFT | 28,969 |
| 136 | 703233 | GRATED LINE DRAIN | LF | 390 |
| 137 | 705204 | 18" CONCRETE FLARED END SECTION | EA | 10 |
| 138 | 705206 | 24" CONCRETE FLARED END SECTION | EA | 2 |
| 139 | 707117 | 36" PRECAST CONCRETE PIPE INLET | LF | 14 |
| 140 | 710126 | REMOVE OVERSIDE DRAIN | EA | 2 |
| 141 | 710136 | REMOVE PIPE (LF) | LF | 1,120 |
| 142 | 710150 | REMOVE INLET | EA | 12 |
| 143 | 710152 | REMOVE HEADWALL | EA | 1 |
| 144 | 710360 | CLEANING, INSPECTING, AND PREPARING CULVERT (LF) | LF | 320 |
| 145 | 721431 | CONCRETE (CONCRETE APRON) | CY | 1.2 |
| 146 | 722020 | GABION | CY | 2,360 |
| 147 | 723095 | ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY) | CY | 370 |
| 148 | 018872 | CHECK DAM | EA | 2 |
| 149 | 729011 | ROCK SLOPE PROTECTION FABRIC (CLASS 8) | SQYD | 740 |
| 150 | 731710 | REMOVE CONCRETE CURB (LF) | LF | 390 |
| 151 | 731790 | REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) | SQYD | 200 |
| 152 | 750001 | MISCELLANEOUS IRON AND STEEL | LB | 6,370 |
| 153 | 018877 | RAILROAD COST (LS) | LS | 1 |
| 154 | 803020 | REMOVE FENCE | LF | 640 |
| 155 | 810120 | REMOVE PAVEMENT MARKER | EA | 90 |
| 156 | 810230 | PAVEMENT MARKER (RETROREFLECTIVE) | EA | 560 |
| 157 | 820113 | TREATMENT BEST MANAGEMENT PRACTICE MARKER | EA | 4 |
| 158 | 820250 | REMOVE ROADSIDE SIGN | EA | 34 |
| 159 | 820300 | REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD) | EA | 11 |
| 160 | 820720 | FURNISH LAMINATED PANEL SIGN (1"-TYPE B) | SQFT | 60 |
| 161 | 820750 | FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) | SQFT | 290 |
| 162 | 820760 | FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) | SQFT | 250 |
| 163 | 820790 | FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) | SQFT | 390 |
| 164 | 820820 | METAL (BARRIER MOUNTED SIGN) | LB | 260 |
| 165 | 820840 | ROADSIDE SIGN - ONE POST | EA | 25 |
| 166 | 820850 | ROADSIDE SIGN - TWO POST | EA | 7 |
| 167 | 820860 | INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) | EA | 29 |
| 168 | 832007 | MIDWEST GUARDRAIL SYSTEM (WOOD POST) | LF | 1,070 |
| 169 | 832070 | VEGETATION CONTROL (MINOR CONCRETE) | SQYD | 370 |
| 170 | 010160 | CONCRETE BARRIER WILDLIFE PASSAGEWAY (TYPE MM) | EA | 6 |
| 171 | 833094 | TUBULAR BICYCLE RAILING | LF | 4,002 |
| 172 | 839580 | END ANCHOR ASSEMBLY (TYPE SFT-M) | EA | 5 |
| 173 | 015299 | ALTERNATIVE IN-LINE TERMINAL TL-3 | EA | 5 |
| 174 | 015019 | ALTERNATIVE CRASH CUSHION TL-3 | EA | 4 |
| 175 | 039968 | CONCRETE BARRIER (TYPE 60M) (MOD) | LF | 2,080 |
| 176 | 839640 | CONCRETE BARRIER (TYPE 60M) | LF | 1,500 |
| 177 | 839649 | CONCRETE BARRIER (TYPE 60MS) | LF | 460 |
| 178 | 839653 | CONCRETE BARRIER (TYPE 60MP) | LF | 22 |
| 179 | 046642 | CONCRETE BARRIER (TYPE 60MA MODIFIED) | LF | 458 |
| 180 | 839695 | CONCRETE BARRIER (TYPE 60PR) | LF | 40 |
| 181 | 048684 | CONCRETE BARRIER (TYPE 86H) | LF | 916 |
| 182 | 017921 | CONCRETE BARRIER (TYPE 86HA) | LF | 3,110 |
| 183 | 839745 | CONCRETE BARRIER TRANSITION | LF | 118 |
| 184 | 839752 | REMOVE GUARDRAIL | LF | 1,590 |
| 185 | 839774 | REMOVE CONCRETE BARRIER | LF | 1,240 |
| 186 | 839782 | REMOVE CRASH CUSHION | EA | 1 |
| 187 | 018875 | ALTERNATIVE BARRIER SYSTEM | LF | 2,900 |
| 188 | 840516 | THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) | SQFT | 3,750 |
| 189 | 846007 | 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) | LF | 20,100 |
| 190 | 846013 | 12" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) | LF | 160 |
| 191 | 846026 | REMOVE PAVEMENT MARKING | SQFT | 1,750 |
| 192 | 846033 | REMOVE TRAFFIC STRIPE | LF | 20,600 |
| 193 | 846051 | 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) | STA | 2.7 |
| 194 | 847082 | 6\" TRAFFIC STRIPE TAPE WITH CONTRAST | LF | 3,080 |
| 195 | 847211 | 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 18-12) | LF | 8,200 |
| 196 | 847212 | 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 6-1) | LF | 950 |
| 197 | 847213 | 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 17-7) | LF | 280 |
| 198 | 847216 | 8" TRAFFIC STRIPE TAPE (WARRANTY) | LF | 2,470 |
| 199 | 870009 | MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION | LS | 1 |
| 200 | 870400 | SIGNAL AND LIGHTING SYSTEM | LS | 1 |
| 201 | 870600 | TRAFFIC MONITORING STATION SYSTEM | LS | 1 |
| 202 | 871300 | CAMERA SYSTEMS | LS | 1 |
| 203 | 871900 | FIBER OPTIC CABLE SYSTEMS | LS | 1 |
| 204 | 872002 | TEMPORARY SIGNAL SYSTEMS | LS | 1 |
| 205 | 872131 | MODIFYING LIGHTING SYSTEMS | LS | 1 |
| 206 | 872133 | MODIFYING SIGNAL AND LIGHTING SYSTEMS | LS | 1 |
| 207 | 872141 | REMOVING LIGHTING SYSTEMS | LS | 1 |
| 208 | 872143 | REMOVING SIGNAL AND LIGHTING SYSTEMS | LS | 1 |
| 209 | 014382 | MODIFYING ELECTRONIC TOLLING SYSTEMS | LS | 1 |
| 210 | 999990 | MOBILIZATION | LS | 1 |