04-0W1404
Replace bridge fender system and skirt modification.
THE CITY AND COUNTY OF SAN FRANCISCO FROM 2.0 MILES WEST OF YERBA BUENA TUNNEL TO YERBA BUENA TUNNEL
- District
- 04
- County-Route-PM
- SF-80-5.7R/7.7R
- Advertised
- 2026-06-22
- Bids open
- 2026-09-16
- Engineer’s estimate
- $110,000,000
- Working days
- 420
- Goal
- NO GOAL %
Bids opened 2026-09-16 · Status: Bid Opened.
Bid item list is from Caltrans Contractor's Corner. Per-item engineer's estimates are withheld by Caltrans until bids open — quantities and units below are the official advertised values.
Bid item list (31 items)
| Item | Code | Description | Unit | Est. Qty |
|---|---|---|---|---|
| 1 | 080060 | LEVEL 2 CRITICAL PATH METHOD SCHEDULE | LS | 1 |
| 2 | 090100 | TIME-RELATED OVERHEAD (WDAY) | WDAY | 420 |
| 3 | 090205 | DISPUTE RESOLUTION BOARD ON-SITE MEETING | EA | 12 |
| 4 | 090210 | HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS | HR | 80 |
| 5 | 120090 | CONSTRUCTION AREA SIGNS | LS | 1 |
| 6 | 120100 | TRAFFIC CONTROL SYSTEM | LS | 1 |
| 7 | 120103 | STATIONARY IMPACT ATTENUATOR VEHICLE | DAY | 50 |
| 8 | 120207 | PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM | DAY | 50 |
| 9 | 128651 | PORTABLE CHANGEABLE MESSAGE SIGN (EA) | EA | 2 |
| 10 | 130100 | JOB SITE MANAGEMENT | LS | 1 |
| 11 | 130201 | WATER POLLUTION CONTROL PROGRAM | LS | 1 |
| 12 | 141001 | HEALTH AND SAFETY PLAN | LS | 1 |
| 13 | 141110 | WORK AREA MONITORING (BRIDGE) | LS | 1 |
| 14 | 141120 | TREATED WOOD WASTE | LB | 1,034,100 |
| 15 | 510054 | STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) | CY | 4,400 |
| 16 | 046491 | STRUCTURAL CONCRETE, BRIDGE (RSC) | CY | 147 |
| 17 | 511106 | DRILL AND BOND DOWEL | LF | 1,458 |
| 18 | 511111 | DRILL AND BOND DOWEL (CHEMICAL ADHESIVE) (LF) | LF | 608 |
| 19 | 048912 | FURNISH PRECAST CONCRETE POST | EA | 260 |
| 20 | 048913 | ERECT PRECAST CONCRETE POST | EA | 260 |
| 21 | 048205 | BAR REINFORCING STEEL (BRIDGE, STAINLESS STEEL) | LB | 576,500 |
| 22 | 048914 | STAINLESS STEEL (BRIDGE) | LB | 29,100 |
| 23 | 048915 | REMOVE COAL TAR | SQFT | 7,590 |
| 24 | 600114 | BRIDGE REMOVAL (PORTION) | LS | 1 |
| 25 | 604100 | GALVANIC ANODES | EA | 5,436 |
| 26 | 750501 | MISCELLANEOUS METAL (BRIDGE) | LB | 1,895 |
| 27 | 048917 | FIBER REINFORCED POLYMER WALER | LF | 10,570 |
| 28 | 048919 | FIBER REINFORCED POLYMER DRAINAGE SYSTEM | EA | 107 |
| 29 | 018466 | UPPER FENDER SYSTEM | SQFT | 26,670 |
| 30 | 048920 | PIPE HANDRAILING (STAINLESS STEEL) | LF | 2,100 |
| 31 | 999991 | MOBILIZATION (MARINE ACCESS) | LS | 1 |