California-certified DVBE · SBA-certified SDVOSB

Verify on Cal eProcure ↗
TD
General contractors bidding school district projects

What Tower DVBE supplies on k-12 school modernization and new classroom buildings

Districts state a DVBE participation goal (usually 3%) on modernization, portable and new-construction bids. The materials below are what primes already buy for these jobs and can put through Tower for full DVBE credit.

The plan opens with these material groups as lines; put your quantities on them, add anything missing, and send it for a same-day quote. Bid due today? Call Carson Reed at 916-949-9361.

The DVBE rule on these bids: DVBE goal set in the bid documents (Mil. & Vet. Code §999, Ed. Code and the district’s own policy); a supplier performing a commercially useful function counts in full.

Electrical and lighting

  • LED fixtures and lamps
  • conduit, boxes and fittings
  • wire and cable
  • occupancy sensors
  • panels and breakers
Browse electrical and lighting in the catalog →

Plumbing and restroom fixtures

  • faucets and flush valves
  • fixtures and carriers
  • pipe, valves and fittings
  • water heaters
  • drinking fountains
Browse plumbing and restroom fixtures in the catalog →

Door hardware and specialties

  • locksets and closers
  • exit devices
  • signage and ADA signs
  • fire extinguishers and cabinets
  • toilet partitions and accessories
Browse door hardware and specialties in the catalog →

Paint, sealants and adhesives

  • interior and exterior paint
  • primers
  • caulks and sealants
  • construction adhesives
  • tape
Browse paint, sealants and adhesives in the catalog →

Jobsite safety and consumables

  • hard hats, vests and gloves
  • eye and hearing protection
  • first aid
  • temporary fencing and barricades
  • cleaning and trash
Browse jobsite safety and consumables in the catalog →

Good to know

  • Most in-stock items ship in 1–5 business days to the jobsite or your yard.
  • Spec-section submittals: ask for the data sheets with the quote.
Invited us to bid? →

Build your own quote in minutes and list us on your participation form.

Certification packet (PDF) →

Certifications, capability sheet and the State letter for your bid file.

Why a DVBE supplier counts in full →

The commercially useful function test, and how Tower meets it.

Other kinds of projects